Archive container

  • TaskPainting, insulation, electrics and lifting into place
 

Project information


This container was also delivered on a turn-key basis. Isolation, electrification, extra door and painting was included in the agreed delivery. At site the container was lifted on steel legs to provide passage from the 2nd floor directly to the archive container.